I started this several post weeks ago, just after the Board of Adjustment meeting that led to the approval of the conditional use permit (CUP) for Teanaway Solar Reserve, but got distracted and didn't finish it until now.
I have been to a number of Board of Adjustment hearings and EFSEC hearings for wind farms, but I've never paid as much attention as I did at the BoA meeting on the Teanaway Solar Reserve project. I don't know any of the citizens who make up the BoA; I mean no disrespect here as I share some of my impressions of the meeting.
The meeting had two parts: first, the Board rejected an appeal of the County's mitigated determination of nonsignificance (MDNS), then they listened to presentations and testimony for and against the TSR project and voted to permit the project.
The MDNS appeal was interesting because it really seemed to me that the people bringing the appeal (the appellants) had a good case. They raised several points, but the ones that resonated most with me had to do with biological surveys looking for endangered or threatened species. These surveys were done over a single 5-day period in late June and early July last summer. I think it's pretty obvious that that's completely inadequate, but apparently it does meet the letter of the law. That doesn't make it OK, and one way to see that better surveys get done would be for the BoA to insist on them. Five days isn't enough time to wait for rare animals to wander by, and it's definitely not enough time to find plants. (Depending on the species, some plants start flowering when the snow melts, and others continue all summer into late fall. Because identifying plants generally depends on looking at their flowers, obviously it would be a good idea to check the site several times during the season. The biological survey for one of the wind farms missed a state threatened plant because the survey was done after the plant had flowered and died.)
One thing I think the appellants got wrong had to do with consideration of alternate sites -- they seemed to be focusing on alternate sites in Kittitas County, when the real question was whether the project would make sense anywhere in Washington.
The interesting thing is, I think the TSR people were prepared to lose the appeal. Their big-city attorney was definitely pounding the table, not the law or the facts, with sarcastic and trivial questions aimed at embarrassing the appellants. But instead the BoA voted 5-0 in TSR's favor.
I don't think the BoA realizes that they have the ability (and the responsibility, really) to insist that things like biological surveys be done not just technically correctly, but diligently. The BoA seemed entirely concerned that the application was technically correct, even though what we got was not good science, legal or not.
Another thing that struck me was that TSR used a WA Department of Fish and Wildlife document that provided guidelines for wind power projects. Apparently a similar document doesn't exist for solar projects. Which means WDFW hasn't had a chance to think about large solar projects in this state. And TSR is billed as the largest solar project in the country. It doesn't make sense not to do a full environmental impact statement, which is all the appellants were asking for.
This is all water under the bridge, of course, since the environmental appeal was denied and then the CUP approved. Now there's a new appeal, addressing the use of a parcel of land needed to connect the project to the transmission lines than run nearby.
Because a number of transmission lines run east-west through our county, various kinds of electricity generation projects will continue to be proposed for as long as there are incentives. I'm in the renewable energy industry, and I like renewable energy, but we don't need to approve every single project that comes along, and we can drive a hard bargain for the ones we do approve.
Showing posts sorted by relevance for query tsr. Sort by date Show all posts
Showing posts sorted by relevance for query tsr. Sort by date Show all posts
Wednesday, September 15, 2010
Monday, September 20, 2010
TSR Development Agreement Meeting
Tomorrow's meeting (at 2:00 in the Board of County Commissioners' hearing room) is about the official agreement between the county and TSR on how construction of the project will be done. One issue that doesn't seem to have been formally resolved yet is how trees removed by the project will be replaced. During the run-up to approval by the Board of Adjustment, TSR said they'd replace trees at a 3:1 ratio, but this only applied to trees that were larger than a certain size. This is important because the site is much better for growing trees than growing solar panels.
Other claims were made by TSR, including how many jobs would be created during construction and on a permanent basis, and where the final assembly of the solar panels will take place. For the record, TSR predicts "as many as 225 family-wage jobs" during construction, and "at least 35" permanent jobs. Disconnects between pre-approval claims and post-approval reality are a common problem with projects like this one, so it will be interesting to see how this one develops.
Other claims were made by TSR, including how many jobs would be created during construction and on a permanent basis, and where the final assembly of the solar panels will take place. For the record, TSR predicts "as many as 225 family-wage jobs" during construction, and "at least 35" permanent jobs. Disconnects between pre-approval claims and post-approval reality are a common problem with projects like this one, so it will be interesting to see how this one develops.
Tuesday, July 20, 2010
TSR sources of information
Here are some sites worth looking at (thanks to Julie for thecart.org).
I do want to make it clear that I'm starting this research process with an open mind, and I'm equally prepared to find that the project is worthwhile, or in the wrong place, or that I need more information.
TSR's Facebook page-- Not a great source of information, but they do seem to post news updates fairly regularly. The site is about 4 miles east of Cle Elum, not north as the FB page says.
For a little while TSR had a blog, but then migrated the blog to their current project web page. The web site includes a "fact vs. fiction" page.
Seattle Times article, Feb. 1, 2010: "Proposed solar power plant tangled in many messy questions." I'm going to have to read this one a couple of times.
Forbes.com's report on the DNS determination.
Strategies 360, the strategic positioning (I think that means "PR") firm that seems to be handling everything related to the project. That the project was mentioned by Forbes indicates that S360 knows what they're doing.
A February announcement by TSR said that Potelco, a Sumner, WA utility contractor would be a "contractor and equity partner." FWIW, Potelco is also a client of S360 and is a subsidiary of Houston-based Quanta Services Inc., which has the enviable ticker symbol of PWR. Renewable Energy Corporation, a solar panel/system manufacturer in Moses Lake, is also a S360 client.
There appear to be two Facebook pages of groups expressing concern about TSR: Friends of the Teanaway River Valley and Citizens for a Rural Teanaway.
Citizens for a Rural Teanaway also has a very informative website where I'll be spending more time. Near the top of the page is a suggestion that the project is more suited for sagebrush country because of sagebrush's supposed inferior aesthetics compared to trees. As a person who grew up in sagebrush country, I happen to think sagebrush is beautiful, and dense trees kind of creep me out.
A January 27, 2010 Daily Record article about the Cle Elum City Council's concerns about the project.
Stay tuned....
I do want to make it clear that I'm starting this research process with an open mind, and I'm equally prepared to find that the project is worthwhile, or in the wrong place, or that I need more information.
TSR's Facebook page-- Not a great source of information, but they do seem to post news updates fairly regularly. The site is about 4 miles east of Cle Elum, not north as the FB page says.
For a little while TSR had a blog, but then migrated the blog to their current project web page. The web site includes a "fact vs. fiction" page.
Seattle Times article, Feb. 1, 2010: "Proposed solar power plant tangled in many messy questions." I'm going to have to read this one a couple of times.
Forbes.com's report on the DNS determination.
Strategies 360, the strategic positioning (I think that means "PR") firm that seems to be handling everything related to the project. That the project was mentioned by Forbes indicates that S360 knows what they're doing.
A February announcement by TSR said that Potelco, a Sumner, WA utility contractor would be a "contractor and equity partner." FWIW, Potelco is also a client of S360 and is a subsidiary of Houston-based Quanta Services Inc., which has the enviable ticker symbol of PWR. Renewable Energy Corporation, a solar panel/system manufacturer in Moses Lake, is also a S360 client.
There appear to be two Facebook pages of groups expressing concern about TSR: Friends of the Teanaway River Valley and Citizens for a Rural Teanaway.
Citizens for a Rural Teanaway also has a very informative website where I'll be spending more time. Near the top of the page is a suggestion that the project is more suited for sagebrush country because of sagebrush's supposed inferior aesthetics compared to trees. As a person who grew up in sagebrush country, I happen to think sagebrush is beautiful, and dense trees kind of creep me out.
A January 27, 2010 Daily Record article about the Cle Elum City Council's concerns about the project.
Stay tuned....
Sunday, July 4, 2010
Teanaway Solar Reserve

One issue that awaiting the new county commissioner is the Teanaway Solar Reserve project, located, according to the project's FaceBook page, 4 miles north of Cle Elum. Here's a fairly comprehensive Yakima Herald-Republic story from October 31, 2009.
The project is controversial because the Cle Elum area could really use more jobs, but the project site is in the Teanaway River area, which is currently only very lightly developed.
I regularly do work as a renewable energy consultant, although I don't do professional work on solar photovoltaic (PV) projects. I'm still learning about this project, and I'm sure I'll be writing more about it, but here's some information to start with.
As shown on the map* above, the TSR site receives less solar radiation than the Puget Sound Energy solar site at Wildhorse. PSE has reportedly decided not to expand the Wildhorse solar project, even though the existing solar panels are already connected to the grid, and the Wildhorse site receives a considerably lower amount of annual precipitation than the TSR area.
Some areas in south-central Washington are reasonably promising for solar PV projects, but, really, most of the action in the U.S. is much farther south.
The next step -- due to be taken this summer -- in the process of considering this project is determining whether an environmental impact statement (EIS) will be required. Since the project is being billed as "the largest in the Northwest" (TSR website) and "one of the world's largest" (Yakima Herald-Republic story), it seems pretty obvious that it is unusual, and that strongly suggests that an EIS should be done. Come to think of it, locating a large solar PV project in the forested mountains is probably not something that has ever been done before, anywhere. Clearly special care is needed in considering how to proceed.
*Click here for map source.
Saturday, August 7, 2010
TSR Summary I: Conditional Use Application

The Teanaway Solar Reserve project highlights one of the challenges of development decisions in any county: what to do with projects that aren't really a good fit for the location, but which owners of the property want to do anyway? What if the project is a really bad fit?
My thinking on this issue took less research than the well moratorium issue (posted July 12), since I know a fair amount about renewable energy. I learned the most about zoning and the County Code as I consulted the following sources:
- A Kittitas County Office of Community Development official
- The Strategies 306 representative in Cle Elum
- A Cle Elum city official
- The websites and news items listed in my post on July 20
- The Kittitas County Code
One thing that is clear is that the site is not excellent, or even very good, for generating solar energy. According to a state solar map, the location receives 3.7-3.8 kW/m2 of solar energy. National solar maps show that there are many locations in the Southwest that receive more than 7 kW/m2. It's hard to find any locations in Washington that are competitive when it comes to solar energy, but here's one example, in Richland. It's in a location that receives 4.1-4.2 kW/m2, and it is a demonstration project, not a utility-scale project. The TSR location seems to have been chosen because it is convenient as a result of the relationships between the various players. Motives are important, but not necessarily relevant when it comes to land use decisions.
What is relevant is how a project relates to the County Code. In this case, the relevant part of the Code is mostly in Title 17 (Zoning), specifically 17.56 (Forest and Range Zone) which is the current zoning of the project site. The Purpose and Intent section of 17.56 says,
The purpose and intent of this zone is to provide for areas of Kittitas County wherein natural resource management is the highest priority and where the subdivision and development of lands for uses and activities incompatible with resource management are discouraged.I expect "resource management" in the Forest and Range Zone was intended to mean things like, well, forest and rangeland, not solar resources, which wouldn't have been part of the traditional understanding of the phrase back when this part of the Code was written.
For each zoning category, there is a list of uses that are allowed without asking the county's permission, and there is a list of uses that are "conditional," meaning the owner/developer needs to get a conditional use permit before proceeding. Although a major solar farm is very unlike any of the conditional uses listed in 17.56, a later section, 17.61 (Utilities) says that utility developments of various kinds are conditional uses in some zones; TSR is what's called a "major alternative energy facility." That means it's worth at least asking the county's permission to do the project.
Whew. It took a fair amount of writing and reading for us just to get to understanding that submitting a conditional use application is worth a try, but it's interesting to learn how all this works. Tune in next time for more on the application (the actual decision is up to the Board of Adjustment, of course).
Saturday, July 24, 2010
TSR Update

On August 11 the Board of Adjustment will meet to hear public comments on the TSR conditional use permit. Later, probably this summer but maybe in the fall, the board will vote on whether to issue the permit. I'm a little surprised at the lack of news and discussion about this project, given how various wind projects were received.
This past week I visited with a cognizant official at the County Planning Department and with various citizens, who helped me understand the process. I continue to be impressed with the professionalism of county staff. Meanwhile, I have yet to find any citizens who support the project.
We all have mixed feelings about wind power projects (and I don't think any of us like the way the Kittitas Wind Project looks), but at least the wind does blow here, more than almost any other place in Washington, and not much less than the best wind power locations in the country. The same is just not true for solar energy: Kittitas county -- the entire Northwest, really -- is not competitive when it comes to megawatt solar photovoltaic potential.
Map sources: Washington solar (top), US solar (middle), Washington wind plus transmission lines (bottom).
Monday, March 17, 2014
Lack of oversight, competition leads to questionable Chamber choice
To the Editor:
I read something confusing in last Thursday's Daily Record. It said economic development (EDD) director Ron Cridlebaugh had taken a job in Douglas County, effective the very next day. David Bowen had been appointed to take over Mr. Cridlebaugh’s duties. Mr. Bowen had very recently – and just as quietly -- been appointed to operate the Central Washington Renewable Energy Collaborative (CWREC).
Those are the peculiar facts as reported. Here's some of what I understand about the background of the situation.
When Mr. Cridlebaugh was hired, the Chamber made a big deal about its search -- it might even have been a national search -- for someone with strong economic development credentials. By lucky coincidence, the very best candidate was right here in economically depressed Ellensburg.
Mr. Bowen, now appointed to both the EDD and the CWREC jobs, has a checkered history in the county and currently owns Mike’s Tavern in Cle Elum.1
The Chamber of Commerce is a private organization that can (and, as seen here, does) do whatever it wants without regard to what anyone else might think or what might actually make sense.
The Chamber would not be able to operate without substantial public funding, and it has positioned itself to play the key role in economic development and other activities for the entire county.
Now, in case they are not already obvious, some confusing things.
CWREC and economic development are being combined. This is a big change, so why is this decision not being explained?2 Is this move the reason an actual economic development professional is suddenly not needed? Or has the title simply been changed?
For Mr. Bowen, there is a clear conflict of interest with the Teanaway solar reserve project, among others.3 TSR is opposed by its neighbors and requires subsidies to make up for its poor location.4 The Chamber knows all this. Why does it not care?
The Chamber will no doubt take it upon itself to lead an effort to establish a port district in Ellensburg. A port district is potentially a good thing, but why should taxpayers support it if this is the way the economic development show is run here?
Finally, how could the Daily Record’s related editorial have been so uncritical? It simply rehashed information from the news item.
We have seen how trust matters. Trust is an issue here too, with both the newspaper and the Chamber.
1On the matter of Mr. Bowen's checkered past, there is the time he accepted a full-time (and apparently unadvertised) job with PSE while still a full-time county commissioner, something disclosed only after the fact. This was another conflict of interest issue, since county commissioners made many decisions before and after this time that affected PSE and PSE's major customers. The move drew at least one interesting letter to the editor. Then there's the fact that Bowen and his fellow commissioners made a series of bone-headed land development decisions and laid the foundation for the county's ongoing problems with the state GMA (over land use) and DOE (over water use). There is not room for a more extensive list.
2Since neither activity has produced much in the way of results, how will combining them yield something greater than the sum of the parts? Instead of addition, might it not be more like multiplying by zero?
3Until recently Mr. Bowen worked for American Forest Land Company (AFLC), which had planned a large development in the Teanaway area; the Teanaway solar reserve project was related to the development plan, and is still on the drawing board even though AFLC has sold most of their land.
4I had forgotten how many blog posts I have written about TSR. Here is a particularly relevant one.
Friday, September 10, 2010
Some of my positions

Here are some of the issues that have come up in conversations with voters, and some of my thinking about them, along with brief comments about my opponent's views. (If any of my comments about my opponent's views are incorrect, I will of course correct them as necessary; my contact information is on the left side of this page.).
Well moratorium: I have written quite a bit about this, and I may be making some adjustments as I get to know SOWR better, but briefly, I think the County Commissioners failed the county by allowing the moratorium to happen. (During the Daily Record candidate forum, my opponent said he would not have behaved any differently than the current commissioners did. As recently as this past weekend, video of the DR forum was on their web page, but seems to have been taken down.)
Teanaway solar reserve: I have written quite a bit about this one too, mostly in late July and early August: I was against TSR before I was for it. I was against it because the project disregards the intent of the government incentives that make it possible. The intent of the incentives is to encourage renewable energy projects in the most productive locations; the TSR site is not a good location, so it is a misuse of the taxpayer money that makes it possible. Now that it has been approved (pending the results of the appeal) I am for it because it will bring at least some jobs to the Upper County. I do have doubts about the developer's claims about job creation, but this is a separate problem.
Wind power: I am basically in favor of wind power. While Kittitas County is not a very good place for utility-scale solar energy, it is an excellent place for wind energy. In addition to our famous wind, we have several important east-west power lines running through our county, which means this issue will be with us for a long time. We already have a wind farm zone overlay that encourages wind farm development on the east end of the county. We should fine-tune the location of that overlay. (During the Daily Record candidate forum, my opponent was unaware that we have a wind farm overlay, which really surprised me; he seemed generally poorly informed about energy issues.)
County economy: we need to move away from the boom-and-bust economy that we've been dealing with since the timber and coal days. Construction was the most recent boom, and is the cause of the most recent bust, and economists agree that it will take a long time for this industry to recover. Unfortunately, it will be a very long time until we see anything like 2007, when the county had the lowest unemployment rate in history. We need to work to diversify our economy and take better advantage of assets like CWU. We need to be working now to fix our economy ourselves, not waiting for the country's economy to recover. (My opponent seems to believe that a return to 2007 is just a matter of not very much time, and that while we wait we should be getting ready for its return.)
CWU: Central Washington University is the largest employer in the county, and over the last three years Central has seen its budget cut by almost one-third. This is a huge problem for our county, but the county has been distracted by other things. County Commissioners should be the chief lobbyists for the county in Olympia, but to do that most effectively the county needs to have good relations with Olympia. As a former CWU faculty member, I understand how the university works, and can address this issue with a great deal of credibility. (My opponent, like the current Board of County Commissioners, doesn't seem to be paying attention to this problem.)
Sunday, August 8, 2010
TSR Summary II: Conditional Use Considerations

As we have seen in earlier posts, large renewable energy projects are conditional uses in agriculture-20, forest and range, commercial agriculture, and commercial forest zones. The TSR project claims to be the largest in the country, maybe the world, and would cover about 1.5 sections (1.5 square miles) in the eastern foothills of the Cascade Mountains of Washington with solar panels.
Once a project has been properly proposed, it's up to the Board of Adjustment (BoA) to consider and decide whether to allow the project to go forward. The relevant sections of the the County Code include 17.60A (Conditional Uses), especially 17.60A.010 and 17.60A.020, which are short enough to quote below (with a little editing for length; my paraphrasing is in [square brackets]). Chapter 17.96 describes the activities of the BoA itself.
Chapter 17.60A.010 Review Criteria.I'm guessing "desirable to the public convenience" is a term of art that means that a project should be beneficial to the county and/or its residents in some way. Likewise, in the Conditions section, conditions can be imposed to make a project more beneficial to the project area or the county as a whole.
The [BoA]...may permit and authorize a conditional use when the following requirements have been met:
1. The [BoA] shall determine that the proposed use is essential or desirable to the public convenience and not [dangerous, annoying or inconsistent with] the character of the surrounding neighborhood.
2. The [BoA] shall determine that the proposed use [will not cost the taxpayers too much, that there is enough infrastructure supporting the project, or that the proposer will supply needed infrastructure, or that it will generate enough economic return to taxpayers to offset costs.]
17.60A.020 Conditions.
1. In permitting such uses the [BoA] may impose in addition to the regulations specified herein, such conditions as it deems necessary to protect the best interests of the surrounding property or neighborhood or the county as a whole.
[2 and 3 aren't very relevant here]
So a conditional use project is supposed to be good for the county in some way, good enough to balance anything unpleasant about the project. Since change is painful, practically any project is going to bother someone, so every project had better have at least some benefits.
Here's where we run into one of the challenges of utility-scale renewable energy projects. In business-speak, these projects are high capex, low opex things. That means they cost a lot to build (capital expense), but don't cost much to operate (operating expense). What's more, most of the capital cost is paid outside the county, to manufacturers and to specialized construction crews that travel from job to job. So these projects don't translate into much in the way of jobs.
And here's also where we run into one of my pet peeves about renewable energy projects in Kittitas county and in Eastern Washington in general: out here is where the renewable energy is, and out here is where we get to live with the facilities that harvest the energy, but almost all of the benefits go somewhere else, especially when we're talking about out-of-county landowners.
That's all for now. I'm not going to presume to suggest how I think the BoA should proceed, but it has been helpful to me to think through these issues.
Photo credit: the Jumilla solar farm in Spain, at about 38.48° north latitude -- about the same latitude as Sacramento; Kittitas county is around 47°. It was the largest in the world, at 20 MW, in 2008.
Sunday, July 18, 2010
Teanaway Solar Reserve

The Teanaway Solar Reserve project will be in the news off and on for the next few weeks, as the county Department of Community Services has issued a mitigated determination of nonsignificance for the project (July 16 Daily Record article, Kittitas County Community Development page. As I wrote earlier, it seems to me that a project of this size and uniqueness in the area deserves a closer look, but that's not necessarily the way State Environmental Policy Act works (RCW 43.21C.030).
This is an interesting topic for several reasons. The county's mishandling of the well moratorium has led to an unusually difficult economy in the Upper County, and the project promises jobs, at least during the construction phase. On the other hand, there appears to be strong opposition to the project among many Upper County residents.
Over the next week or so I'll be taking a closer look at the project, and talking to various stakeholders in the same way I analyzed the well moratorium issue.
Tuesday, August 10, 2010
District 3

Note: this post is a bit of election housekeeping. If you're looking for the TSR posts, scroll down, or check out the Blog Archive at the left.
A number of you have contacted me, wondering why the primary ballot you got in the mail doesn't include the opportunity to vote for me. It turns out District 3, which is the area that votes for this County Commissioner seat in the primary, doesn't include as much of Ellensburg as many of us thought. It's especially confusing in the part of town shown on the map. It probably doesn't help that I have a few signs in District 1, but when people who live on busy streets ask, I give them a sign.
There's every reason to believe that you'll be able to vote for me in the general election, which will include the entire county. Meanwhile, you can still call or e-mail your District 3 friends and ask them to vote for me. Thanks for your support!
Wednesday, August 11, 2010
TSR Approved
I've just come back from the Board of Adjustment meeting, which ran from 6 pm until after 10 -- I left just before the vote, which appeared to be heading toward approval. It's hard to distill over 4 hours of public meeting into a blog post, but here's a quick try.
It certainly is good that the Upper County will see some jobs during construction. It was refreshing to hear the contractor virtually promise lots of local jobs, after hearing wind farm companies at other meetings basically say that the wouldn't be hiring local people. As for long-term jobs, I have a hard time coming up with 35 job titles for a facility with no moving parts -- it's not like they'll be running three shifts. But I digress.
What I keep coming back to is the poor business case for the project. We're much too far north for reasonable solar energy production. It's a matter of cosmology and physics. What we're seeing is an unintended consequence of government incentives for renewable energy projects. In other kinds of business, if a company makes a mistake like siting a $300+ million project hundreds of miles north of where it should be, the company loses money. In this case, it's us (we?) taxpayers who will be paying for the poor location.
Tax and other incentives are a good tool, but I have seen so much abuse of them in the renewable energy industry that I have to wonder if they really are such a good tool, after all. I'll have to think about this. Meanwhile, on the bright side (no pun!), we can expect to see the Governor and at least one Senator visiting Kittitas County, and that'll be fun.
It certainly is good that the Upper County will see some jobs during construction. It was refreshing to hear the contractor virtually promise lots of local jobs, after hearing wind farm companies at other meetings basically say that the wouldn't be hiring local people. As for long-term jobs, I have a hard time coming up with 35 job titles for a facility with no moving parts -- it's not like they'll be running three shifts. But I digress.
What I keep coming back to is the poor business case for the project. We're much too far north for reasonable solar energy production. It's a matter of cosmology and physics. What we're seeing is an unintended consequence of government incentives for renewable energy projects. In other kinds of business, if a company makes a mistake like siting a $300+ million project hundreds of miles north of where it should be, the company loses money. In this case, it's us (we?) taxpayers who will be paying for the poor location.
Tax and other incentives are a good tool, but I have seen so much abuse of them in the renewable energy industry that I have to wonder if they really are such a good tool, after all. I'll have to think about this. Meanwhile, on the bright side (no pun!), we can expect to see the Governor and at least one Senator visiting Kittitas County, and that'll be fun.